flowpactworkflow contracts
Rules

FP903 · override-expiring-soon

An override expires within 14 days.

CodeNameCategoryDefault severity
FP903override-expiring-soonConfig & overrides🔵 info

Why it matters

A heads-up so the owner can finish the follow-up before the build starts failing.

How to fix

Fix the underlying findings, or extend expires with an updated reason.

Configure

Change the severity (or turn the rule off) in .github/flowpact/flowpact.config.yml, by code or by name:

.github/flowpact/flowpact.config.yml
rules:
  FP903: off
  # or: override-expiring-soon: error

Explain it in the terminal:

flowpact explain FP903

On this page